  • ETC of 1X660 MW Boiler & Auxiliaries of Unit-1 including Auxiliary Boiler, O&M for supply of Cranes and providing FSA Engineers for BHEL, Maitree STPP, Rampal, Bangladesh  on 4th May 2018

  • Services of Onsite Mechanical Assembly of 1390 MW Steam Turbine for ABENER, Waad Al Shamal ISCC Power Plant, KSA on 3rd May 2018 
  • Mechanical Assembly for the  Shuaibah-3 Second Water Expansion Seawater Desalination Plant of Fisia Abeima LLC, Shuaibah, KSA  30th Apr 2018

  • Dismantling and Erection of Pressure parts in Stage -1 of 3X660 MW NTPC Barh, Bihar, India on 27th March 2018
  • Laying of 16” OD  22.5 Km R-LNG Pipe line from Ennore LNG M terminal to MFL of EMBPL, Tamilnadu, India on  30th Jan 201
  • Erection, Installation, Testing and Commissioning and handover of Two Units of HRSG of 750 MW Sabiya CCGT-1 Project, Kuwait on 24th Jan 2018
  • The Infrastructure Development Works required for development of Medical Device Manufacturing Park for Andhra Pradesh Med Tech Zone Limited (AMTZ) at Visakhapatnam, Andhra Pradesh, India on 28th Nov 2017
  • Erection services of STG & its auxiliaries for Harduaganj Thermal Power Project (1X660 MW)-Ext II at district Aligarh, Uttar Pradesh, India on 17th Nov 2017
  • All civil and Architectural works required for Coal Handling Plant and BOP Building area at 4X270 MW Bhadradri Thermal Power Station, Bhadradri, Kothagudem, Telangana, India on 10th Nov 2017
  • ECP Contract for Supply & Service for Tower Package TW05 for 132KV S/C (on D/C Tower) Rupai – Chapakhowa Transmission Line for Assam State associated with NER Power System Improvement Project for Power Grid Corporation of India Limited (PGCIL), Assam, India on Sep-2017
  • Manpower Services for Piping Works of Jebel Ali Power Station M-Extension, UAE of client Siemens AG, Erlangen, Germany on 31st Aug-2017
  • 400MW Refinery Captive Power Project Erection, Testing and Commissioning of 8 sets of HRSG, 8 sets of GT, 4 sets of ST, 4 sets of Utility Boiler, Piping, Civil, Electrical, I&C for Dangote Oil Refining Company Limited,  Nigeria on 30th Jun -2017
  • 2 X800 MW Mechanical (E&C) ESP package of Unit # 2 for NTPC, Ramagundam, Telangana, Inida on 29th  Jun 2017
  • 1800MW ALBA PS5 CCPP Installation works of HRSG Center Line (STG & GTG) #1,#2 & #3 for GAMA, Kingdom of Bahrain on 21st Jun 2017